DavisStrait May07 * SG001 * Dive index * Mission links * Dive 791 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.63 of 91.80 AH used of 24V (56.83% remains)
• Previous NAKs 2, Timeouts 0 • 16.05 of 61.20 AH used of 10V (73.77% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 4.7 m at 5.9 m depth, ceiling 1.2 m
• GPS1 time: 32 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 648 - - - 2027 - -121.6 -43.17 - 2753 - - - - - - - - - - -
108 0.8 -0.9 6 120 roll -1.07 6.78 - 2061 208.4 2.28 - 590 -630.3 -121.6 - - 2758 - - - - - - - - - - -
230 15.7 7.8 19 343 done -0.25 0.98 - 2270 213.3 - - 2329 - - 98.60 0.001 2255 -5.1 8.290 - - - - - - - - -
349 21.1 - 32 466 roll 1.07 1.25 - 2553 226.4 2.42 - 3787 602.5 121.6 98.25 0.001 1768 -5.0 10.825 - - - - - - - - -
SM 0.33 - - - - -7.42 - - 652 - - - 2192 - 200.41 50.10 0.001 1448 -6.4 0.215 - - - - - -