DavisStrait May07 * SG001 * Dive index * Mission links * Dive 786 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.39 of 91.80 AH used of 24V (57.09% remains)
• Previous NAKs 2, Timeouts 0 • 15.97 of 61.20 AH used of 10V (73.91% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 10 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 607 - - - 2128 - -121.6 -43.42 - 2750 - - - - - - - - - - -
102 0.3 - 6 126 roll -1.07 6.90 - 2057 210.1 2.50 - 638 -596.0 -121.6 - - 2759 - - - - - - - - - - -
226 15.2 7.9 19 328 done -0.25 1.00 - 2248 191.0 - - 2524 - - 97.90 0.001 2261 -5.1 8.003 - - - - - - - - -
334 20.8 - 31 450 roll 1.07 1.35 - 2524 204.4 2.33 - 3791 543.8 121.6 98.68 0.001 1773 -4.9 10.646 - - - - - - - - -
SM 0.33 - - - - -7.47 - - 644 - - - 2048 - 200.66 49.55 - 1445 -6.6 INF - - - - - -