DavisStrait May07 * SG001 * Dive index * Mission links * Dive 782 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 39.19 of 91.80 AH used of 24V (57.31% remains)
• Previous NAKs 2, Timeouts 0 • 15.90 of 61.20 AH used of 10V (74.01% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.2 m depth, ceiling -993.8 m
• GPS1 time: 27 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 634 - - - 2060 - -121.6 -43.53 - 2764 - - - - - - - - - - -
102 0.5 -0.4 6 126 roll -1.07 7.30 - 2071 196.8 2.62 - 562 -571.8 -121.6 - - 2758 - - - - - - - - - - -
250 15.6 6.5 22 360 done -0.25 0.75 - 2239 224.0 - - 2471 - - 99.62 0.001 2252 -5.1 8.201 - - - - - - - - -
366 21.2 - 34 482 roll 1.07 2.28 - 2562 141.7 2.42 - 3796 547.5 121.6 98.25 0.001 1766 -4.9 10.854 - - - - - - - - -
SM 0.33 - - - - -7.37 - - 664 - - - 2069 - 200.16 49.55 - 1446 -6.5 INF - - - - - -