DavisStrait May07 * SG001 * Dive index * Mission links * Dive 776 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 38.90 of 91.80 AH used of 24V (57.63% remains)
• Previous NAKs 2, Timeouts 0 • 15.80 of 61.20 AH used of 10V (74.17% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.15 (beyond SM_CC=200) • surface range 7.0 m at 5.5 m depth, ceiling -1.5 m
• GPS1 time: 32 s
• GPS2 time: 28 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 604 - - - 2192 - -121.6 -43.38 - 2765 - - - - - - - - - - -
102 0.5 -0.4 6 122 roll -1.07 7.00 - 2101 213.9 3.03 - 578 -532.7 -121.6 - - 2762 - - - - - - - - - - -
267 15.3 5.8 25 380 done -0.25 0.75 - 2278 236.0 - - 2466 - - 99.68 0.001 2259 -5.0 7.991 - - - - - - - - -
386 20.8 - 38 501 roll 1.07 1.90 - 2525 130.0 3.03 - 3799 439.9 121.6 98.18 0.001 1765 -5.0 10.832 - - - - - - - - -
SM 0.34 - - - - -7.44 - - 651 - - - 2073 - 201.15 49.70 - 1448 -6.4 INF - - - - - -