DavisStrait May07 * SG001 * Dive index * Mission links * Dive 77 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 4.00 of 91.80 AH used of 24V (95.64% remains)
• Previous NAKs 0, Timeouts 0 • 4.43 of 61.20 AH used of 10V (92.76% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.6 m at 5.6 m depth, ceiling 3.0 m
• GPS1 time: 18 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 607 - - - 2067 - -121.6 -43.45 - 2761 - - - - - - - - - - -
102 0.5 -0.4 6 122 roll -1.07 8.02 - 2102 186.4 2.12 - 590 -696.7 -121.6 - - 2763 - - - - - - - - - - -
245 15.5 6.2 22 356 done -0.25 0.70 - 2241 198.6 - - 2470 - - 98.32 0.001 2267 -5.0 8.093 - - - - - - - - -
362 20.9 - 35 474 roll 1.07 1.35 - 2527 211.9 2.55 - 3798 520.8 121.6 98.12 0.001 1771 -5.1 10.935 - - - - - - - - -
SM 0.34 - - - - -7.63 - - 606 - - - 2051 - 200.41 50.20 - 1452 -6.4 INF - - - - - -