DavisStrait May07 * SG001 * Dive index * Mission links * Dive 766 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 38.40 of 91.80 AH used of 24V (58.17% remains)
• Previous NAKs 2, Timeouts 0 • 15.64 of 61.20 AH used of 10V (74.44% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.4 m at 5.1 m depth, ceiling 2.7 m
• GPS1 time: 26 s
• GPS2 time: 22 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 99 done -1.07 - - 610 - - - 2054 - -121.6 -43.40 - 2755 - - - - - - - - - - -
111 0.9 -1.1 6 131 roll -1.07 7.22 - 2091 205.1 3.03 - 555 -494.7 -121.6 - - 2754 - - - - - - - - - - -
211 15.1 6.6 16 321 done -0.25 0.73 - 2229 189.0 - - 2449 - - 98.75 0.001 2261 -5.0 7.803 - - - - - - - - -
327 20.8 - 28 445 roll 1.07 1.50 - 2546 211.3 2.55 - 3796 528.2 121.6 98.07 0.001 1770 -5.0 10.778 - - - - - - - - -
SM 0.34 - - - - -7.45 - - 620 - - - 2209 - 200.16 49.38 - 1450 -6.5 INF - - - - - -