DavisStrait May07 * SG001 * Dive index * Mission links * Dive 758 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 37.99 of 91.80 AH used of 24V (58.61% remains)
• Previous NAKs 2, Timeouts 0 • 15.51 of 61.20 AH used of 10V (74.66% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.9 m depth, ceiling -993.1 m
• GPS1 time: 10 s
• GPS2 time: 12 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 624 - - - 2207 - -121.6 -43.53 - 2754 - - - - - - - - - - -
101 0.3 - 6 122 roll -1.07 7.00 - 2120 213.7 2.60 - 620 -610.4 -121.6 - - 2755 - - - - - - - - - - -
271 15.3 5.2 26 373 done -0.25 0.57 - 2256 238.6 - - 2536 - - 98.15 0.001 2259 -5.1 8.003 - - - - - - - - -
380 20.3 - 38 494 roll 1.07 1.25 - 2545 231.2 2.42 - 3785 516.1 121.6 97.65 0.001 1772 -5.0 10.479 - - - - - - - - -
SM 0.33 - - - - -7.63 - - 598 - - - 2040 - 200.16 50.03 - 1443 -6.6 INF - - - - - -