DavisStrait May07 * SG001 * Dive index * Mission links * Dive 751 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 37.64 of 91.80 AH used of 24V (58.99% remains)
• Previous NAKs 0, Timeouts 0 • 15.39 of 61.20 AH used of 10V (74.85% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.0 m depth, ceiling -994.0 m
• GPS1 time: 8 s
• GPS2 time: 36 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 656 - - - 2025 - -121.6 -43.72 - 2762 - - - - - - - - - - -
103 0.6 -0.5 6 123 roll -1.07 6.75 - 2077 210.5 2.60 - 566 -561.2 -121.6 - - 2758 - - - - - - - - - - -
255 15.3 6.2 23 367 done -0.25 0.75 - 2231 205.3 - - 2474 - - 98.78 0.001 2259 -5.1 8.000 - - - - - - - - -
375 20.9 - 36 488 roll 1.07 2.00 - 2545 157.0 2.47 - 3791 533.2 121.6 97.85 0.001 1769 -5.0 10.833 - - - - - - - - -
SM 0.33 - - - - -7.69 - - 590 - - - 2049 - 200.16 49.10 0.001 1444 -6.6 0.223 - - - - - -