DavisStrait May07 * SG001 * Dive index * Mission links * Dive 742 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 37.19 of 91.80 AH used of 24V (59.49% remains)
• Previous NAKs 2, Timeouts 0 • 15.25 of 61.20 AH used of 10V (75.09% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 3.8 m at 5.8 m depth, ceiling 2.0 m
• GPS1 time: 26 s
• GPS2 time: 25 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 618 - - - 2050 - -121.6 -43.25 - 2760 - - - - - - - - - - -
103 0.3 - 6 123 roll -1.07 7.03 - 2080 208.0 2.58 - 596 -563.6 -121.6 - - 2758 - - - - - - - - - - -
242 15.4 6.1 22 347 done -0.25 0.75 - 2234 205.3 - - 2387 - - 98.38 0.001 2264 -5.0 8.004 - - - - - - - - -
358 20.7 - 34 474 roll 1.07 1.52 - 2541 202.0 2.88 - 3788 486.5 121.6 98.72 0.001 1762 -5.1 10.895 - - - - - - - - -
SM 0.33 - - - - -7.64 - - 604 - - - 2046 - 200.41 49.03 - 1448 -6.4 INF - - - - - -