DavisStrait May07 * SG001 * Dive index * Mission links * Dive 736 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.88 of 91.80 AH used of 24V (59.82% remains)
• Previous NAKs 2, Timeouts 0 • 15.15 of 61.20 AH used of 10V (75.25% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.2 m depth, ceiling -993.8 m
• GPS1 time: 34 s
• GPS2 time: 34 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 680 - - - 2025 - -121.6 -43.58 - 2765 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 6.75 - 2091 209.0 2.42 - 590 -593.0 -121.6 - - 2759 - - - - - - - - - - -
245 15.4 6.0 22 357 done -0.25 0.73 - 2245 211.0 - - 2472 - - 98.30 0.001 2263 -5.0 8.043 - - - - - - - - -
363 20.8 - 35 478 roll 1.07 1.52 - 2578 219.1 2.53 - 3786 519.4 121.6 99.47 0.001 1767 -5.0 10.735 - - - - - - - - -
SM 0.33 - - - - -7.64 - - 607 - - - 2032 - 200.66 48.92 - 1440 -6.7 INF - - - - - -