DavisStrait May07 * SG001 * Dive index * Mission links * Dive 731 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.63 of 91.80 AH used of 24V (60.09% remains)
• Previous NAKs 2, Timeouts 0 • 15.06 of 61.20 AH used of 10V (75.39% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 6.8 m at 5.6 m depth, ceiling -1.2 m
• GPS1 time: 11 s
• GPS2 time: 32 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 649 - - - 2034 - -121.6 -43.25 - 2763 - - - - - - - - - - -
102 0.5 -0.3 6 121 roll -1.07 6.75 - 2074 211.1 2.05 - 694 -653.7 -121.6 - - 2755 - - - - - - - - - - -
251 15.2 6.4 23 362 done -0.25 1.00 - 2274 200.0 - - 2407 - - 98.57 0.001 2254 -5.1 7.996 - - - - - - - - -
370 20.8 - 36 484 roll 1.07 1.23 - 2534 211.4 2.58 - 3786 534.5 121.6 97.80 0.001 1771 -4.9 10.632 - - - - - - - - -
SM 0.33 - - - - -7.48 - - 634 - - - 2032 - 200.66 49.88 0.001 1449 -6.5 0.218 - - - - - -