DavisStrait May07 * SG001 * Dive index * Mission links * Dive 730 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.59 of 91.80 AH used of 24V (60.14% remains)
• Previous NAKs 2, Timeouts 0 • 15.05 of 61.20 AH used of 10V (75.42% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 7.0 m at 5.6 m depth, ceiling -1.4 m
• GPS1 time: 24 s
• GPS2 time: 20 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 636 - - - 2056 - -121.6 -43.50 - 2757 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 6.75 - 2061 211.1 2.22 - 607 -652.7 -121.6 - - 2758 - - - - - - - - - - -
236 15.1 7.1 21 348 done -0.25 1.00 - 2284 223.0 - - 2356 - - 98.32 0.001 2263 -5.0 7.868 - - - - - - - - -
354 20.9 - 34 468 roll 1.07 1.23 - 2533 202.4 2.58 - 3796 558.1 121.6 98.68 0.001 1768 -5.0 10.851 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 641 - - - 2021 - 200.66 49.55 - 1442 -6.6 INF - - - - - -