DavisStrait May07 * SG001 * Dive index * Mission links * Dive 729 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.54 of 91.80 AH used of 24V (60.20% remains)
• Previous NAKs 2, Timeouts 0 • 15.03 of 61.20 AH used of 10V (75.44% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 5.2 m at 6.0 m depth, ceiling 0.8 m
• GPS1 time: 11 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 679 - - - 2046 - -121.6 -43.45 - 2770 - - - - - - - - - - -
103 0.6 -0.4 6 123 roll -1.07 6.75 - 2053 203.6 2.42 - 598 -598.3 -121.6 - - 2762 - - - - - - - - - - -
249 15.4 6.7 22 361 done -0.25 0.95 - 2307 267.4 - - 2459 - - 98.70 0.001 2260 -5.1 8.107 - - - - - - - - -
368 21.0 - 35 482 roll 1.07 1.75 - 2537 131.4 2.85 - 3782 464.2 121.6 98.93 0.001 1769 -5.0 10.788 - - - - - - - - -
SM 0.34 - - - - -7.49 - - 635 - - - 2052 - 200.16 49.12 0.001 1449 -6.5 0.226 - - - - - -