DavisStrait May07 * SG001 * Dive index * Mission links * Dive 727 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.44 of 91.80 AH used of 24V (60.30% remains)
• Previous NAKs 2, Timeouts 0 • 15.00 of 61.20 AH used of 10V (75.50% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.64 (beyond SM_CC=200) • surface range 999.0 m at 5.7 m depth, ceiling -993.3 m
• GPS1 time: 7 s
• GPS2 time: 19 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 626 - - - 1956 - -121.6 -43.70 - 2756 - - - - - - - - - - -
102 0.3 - 6 121 roll -1.07 6.78 - 2090 215.9 2.15 - 667 -599.5 -121.6 - - 2758 - - - - - - - - - - -
245 15.6 6.7 22 357 done -0.25 0.95 - 2293 213.7 - - 2545 - - 98.50 0.001 2258 -5.1 8.196 - - - - - - - - -
364 21.2 - 35 477 roll 1.07 1.20 - 2547 211.7 2.62 - 3793 476.3 121.6 98.70 0.001 1774 -4.9 10.760 - - - - - - - - -
SM 0.34 - - - - -7.57 - - 644 - - - 2056 - 201.64 49.05 0.001 1444 -6.7 0.234 - - - - - -