DavisStrait May07 * SG001 * Dive index * Mission links * Dive 722 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.21 of 91.80 AH used of 24V (60.55% remains)
• Previous NAKs 2, Timeouts 0 • 14.92 of 61.20 AH used of 10V (75.63% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 1.7 m at 5.8 m depth, ceiling 4.1 m
• GPS1 time: 33 s
• GPS2 time: 23 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 646 - - - 2079 - -121.6 -43.45 - 2756 - - - - - - - - - - -
102 0.5 -0.3 6 122 roll -1.07 6.75 - 2089 213.8 2.60 - 606 -566.5 -121.6 - - 2762 - - - - - - - - - - -
245 15.2 6.3 22 347 done -0.25 0.62 - 2252 262.9 - - 2454 - - 97.97 0.001 2262 -5.1 8.029 - - - - - - - - -
353 20.6 - 34 467 roll 1.07 1.52 - 2553 198.0 2.50 - 3790 534.4 121.6 98.93 0.001 1767 -5.0 10.668 - - - - - - - - -
SM 0.34 - - - - -7.52 - - 626 - - - 2043 - 200.16 48.80 - 1455 -6.4 INF - - - - - -