DavisStrait May07 * SG001 * Dive index * Mission links * Dive 721 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 36.16 of 91.80 AH used of 24V (60.61% remains)
• Previous NAKs 2, Timeouts 0 • 14.90 of 61.20 AH used of 10V (75.65% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.2 m depth, ceiling -993.8 m
• GPS1 time: 22 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 621 - - - 2047 - -121.6 -43.60 - 2765 - - - - - - - - - - -
102 0.3 - 6 121 roll -1.07 6.93 - 2071 209.2 2.40 - 579 -611.7 -121.6 - - 2771 - - - - - - - - - - -
229 15.1 7.4 20 342 done -0.25 0.90 - 2277 228.9 - - 2486 - - 99.82 0.001 2259 -5.1 8.016 - - - - - - - - -
348 21.0 - 33 462 roll 1.07 1.27 - 2560 222.8 2.72 - 3788 478.7 121.6 98.93 0.001 1767 -5.0 10.809 - - - - - - - - -
SM 0.34 - - - - -7.42 - - 632 - - - 2078 - 200.66 49.20 0.001 1443 -6.6 0.229 - - - - - -