DavisStrait May07 * SG001 * Dive index * Mission links * Dive 716 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.92 of 91.80 AH used of 24V (60.87% remains)
• Previous NAKs 2, Timeouts 0 • 14.82 of 61.20 AH used of 10V (75.79% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 3.0 m at 5.2 m depth, ceiling 2.2 m
• GPS1 time: 16 s
• GPS2 time: 13 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 632 - - - 2032 - -121.6 -43.35 - 2760 - - - - - - - - - - -
101 0.3 - 6 121 roll -1.07 7.00 - 2094 208.9 2.17 - 575 -671.4 -121.6 - - 2758 - - - - - - - - - - -
256 15.5 5.5 24 368 done -0.25 1.05 - 2277 174.3 - - 2477 - - 97.35 0.001 2265 -5.1 8.124 - - - - - - - - -
375 20.5 - 37 489 roll 1.07 1.23 - 2542 215.4 2.15 - 3786 608.8 121.6 99.20 0.001 1771 -5.0 10.566 - - - - - - - - -
SM 0.34 - - - - -7.44 - - 631 - - - 2180 - 200.41 48.75 - 1446 -6.7 INF - - - - - -