DavisStrait May07 * SG001 * Dive index * Mission links * Dive 715 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.87 of 91.80 AH used of 24V (60.93% remains)
• Previous NAKs 2, Timeouts 0 • 14.80 of 61.20 AH used of 10V (75.81% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.9 m at 5.0 m depth, ceiling 2.1 m
• GPS1 time: 31 s
• GPS2 time: 29 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 634 - - - 2070 - -121.6 -43.40 - 2759 - - - - - - - - - - -
103 0.3 - 6 123 roll -1.07 6.78 - 2071 211.9 2.42 - 615 -601.2 -121.6 - - 2759 - - - - - - - - - - -
242 15.6 7.7 22 355 done -0.25 1.27 - 2283 166.9 - - 2522 - - 98.45 0.001 2271 -5.0 8.003 - - - - - - - - -
362 21.0 - 35 476 roll 1.07 1.20 - 2531 206.7 2.35 - 3786 537.9 121.6 97.35 0.001 1770 -5.1 11.186 - - - - - - - - -
SM 0.34 - - - - -7.53 - - 615 - - - 2029 - 200.16 49.28 0.001 1452 -6.5 0.224 - - - - - -