DavisStrait May07 * SG001 * Dive index * Mission links * Dive 714 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.82 of 91.80 AH used of 24V (60.98% remains)
• Previous NAKs 2, Timeouts 0 • 14.78 of 61.20 AH used of 10V (75.84% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 2.2 m at 5.5 m depth, ceiling 3.3 m
• GPS1 time: 21 s
• GPS2 time: 11 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 614 - - - 2052 - -121.6 -43.50 - 2761 - - - - - - - - - - -
103 0.3 - 6 127 roll -1.07 7.03 - 2084 209.1 2.22 - 588 -659.5 -121.6 - - 2760 - - - - - - - - - - -
248 15.5 6.6 22 351 done -0.25 0.60 - 2244 266.7 - - 2478 - - 97.57 0.001 2261 -5.1 8.205 - - - - - - - - -
357 20.7 - 34 471 roll 1.07 1.42 - 2564 225.4 2.80 - 3789 468.2 121.6 99.22 0.001 1765 -5.0 10.710 - - - - - - - - -
SM 0.34 - - - - -7.57 - - 616 - - - 2079 - 200.66 48.50 - 1459 -6.3 INF - - - - - -