DavisStrait May07 * SG001 * Dive index * Mission links * Dive 704 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.31 of 91.80 AH used of 24V (61.54% remains)
• Previous NAKs 2, Timeouts 0 • 14.62 of 61.20 AH used of 10V (76.12% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 3.3 m at 5.6 m depth, ceiling 2.3 m
• GPS1 time: 26 s
• GPS2 time: 34 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 613 - - - 2033 - -121.6 -43.53 - 2757 - - - - - - - - - - -
103 0.6 -0.6 6 123 roll -1.07 7.00 - 2071 208.3 2.47 - 698 -540.5 -121.6 - - 2758 - - - - - - - - - - -
238 15.3 6.9 21 341 done -0.25 0.82 - 2273 246.3 - - 2444 - - 97.88 0.001 2256 -5.1 8.122 - - - - - - - - -
348 20.9 - 33 463 roll 1.07 1.10 - 2545 247.3 2.55 - 3734 505.9 121.6 98.25 0.001 1769 -5.0 10.722 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 613 - - - 2015 - 200.16 49.53 - 1440 -6.6 INF - - - - - -