DavisStrait May07 * SG001 * Dive index * Mission links * Dive 700 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 35.10 of 91.80 AH used of 24V (61.76% remains)
• Previous NAKs 2, Timeouts 0 • 14.55 of 61.20 AH used of 10V (76.22% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 6.6 m at 4.9 m depth, ceiling -1.7 m
• GPS1 time: 18 s
• GPS2 time: 37 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 625 - - - 2067 - -121.6 -43.35 - 2756 - - - - - - - - - - -
103 0.3 - 6 128 roll -1.07 7.05 - 2085 207.1 3.22 - 659 -437.3 -121.6 - - 2762 - - - - - - - - - - -
243 15.1 6.9 21 346 done -0.25 1.02 - 2288 199.0 - - 2536 - - 97.80 0.001 2261 -5.1 8.040 - - - - - - - - -
353 20.9 - 33 467 roll 1.07 1.50 - 2556 178.7 2.72 - 3786 459.6 121.6 98.47 0.001 1776 -4.9 10.700 - - - - - - - - -
SM 0.34 - - - - -7.56 - - 606 - - - 2019 - 200.16 49.50 - 1439 -6.8 INF - - - - - -