DavisStrait May07 * SG001 * Dive index * Mission links * Dive 697 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.94 of 91.80 AH used of 24V (61.93% remains)
• Previous NAKs 2, Timeouts 0 • 14.50 of 61.20 AH used of 10V (76.30% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 6.0 m depth, ceiling -993.0 m
• GPS1 time: 27 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 636 - - - 2192 - -121.6 -43.47 - 2762 - - - - - - - - - - -
109 0.6 -0.5 6 133 roll -1.07 6.70 - 2090 217.0 3.00 - 623 -523.0 -121.6 - - 2750 - - - - - - - - - - -
215 15.3 6.2 17 318 done -0.25 0.75 - 2262 229.3 - - 2543 - - 98.28 0.001 2262 -5.0 7.863 - - - - - - - - -
324 20.5 - 29 438 roll 1.07 1.52 - 2564 198.7 2.33 - 3785 533.0 121.6 98.88 0.001 1764 -5.0 10.686 - - - - - - - - -
SM 0.34 - - - - -7.48 - - 613 - - - 2061 - 200.16 48.60 - 1451 -6.4 INF - - - - - -