DavisStrait May07 * SG001 * Dive index * Mission links * Dive 688 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.49 of 91.80 AH used of 24V (62.43% remains)
• Previous NAKs 0, Timeouts 0 • 14.35 of 61.20 AH used of 10V (76.55% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 6.4 m at 5.1 m depth, ceiling -1.3 m
• GPS1 time: 34 s
• GPS2 time: 33 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 603 - - - 2044 - -121.6 -43.50 - 2760 - - - - - - - - - - -
103 0.3 - 6 123 roll -1.07 7.28 - 2069 201.4 2.33 - 590 -624.0 -121.6 - - 2748 - - - - - - - - - - -
223 15.3 7.5 19 326 done -0.25 1.02 - 2281 207.8 - - 2482 - - 97.72 0.001 2264 -5.0 7.843 - - - - - - - - -
332 20.7 - 31 446 roll 1.07 2.00 - 2540 129.5 2.60 - 3788 502.3 121.6 98.55 0.001 1760 -5.1 10.957 - - - - - - - - -
SM 0.34 - - - - -7.39 - - 653 - - - 2075 - 200.41 48.97 0.001 1441 -6.5 0.226 - - - - - -