DavisStrait May07 * SG001 * Dive index * Mission links * Dive 686 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.39 of 91.80 AH used of 24V (62.54% remains)
• Previous NAKs 2, Timeouts 0 • 14.32 of 61.20 AH used of 10V (76.60% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.7 m at 5.0 m depth, ceiling 2.3 m
• GPS1 time: 25 s
• GPS2 time: 33 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 613 - - - 2147 - -121.6 -43.35 - 2754 - - - - - - - - - - -
103 0.3 - 6 124 roll -1.07 7.00 - 2106 213.3 2.83 - 534 -570.0 -121.6 - - 2755 - - - - - - - - - - -
273 15.5 5.7 26 376 done -0.25 0.65 - 2236 200.0 - - 2446 - - 97.95 0.001 2264 -5.0 8.042 - - - - - - - - -
383 20.5 - 38 497 roll 1.07 1.40 - 2533 212.1 2.53 - 3785 529.2 121.6 99.12 0.001 1769 -5.0 10.596 - - - - - - - - -
SM 0.33 - - - - -7.33 - - 662 - - - 2062 - 200.41 48.65 - 1455 -6.5 INF - - - - - -