DavisStrait May07 * SG001 * Dive index * Mission links * Dive 684 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.29 of 91.80 AH used of 24V (62.65% remains)
• Previous NAKs 2, Timeouts 0 • 14.29 of 61.20 AH used of 10V (76.66% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 4.5 m at 5.1 m depth, ceiling 0.6 m
• GPS1 time: 19 s
• GPS2 time: 21 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 97 done -1.07 - - 649 - - - 2062 - -121.6 -43.62 - 2758 - - - - - - - - - - -
108 0.9 -1.0 6 121 roll -1.07 6.72 - 2097 215.5 2.33 - 611 -622.7 -121.6 - - 2764 - - - - - - - - - - -
222 15.3 6.2 18 335 done -0.25 0.70 - 2258 230.0 - - 2525 - - 99.07 0.001 2264 -5.0 7.992 - - - - - - - - -
343 20.7 - 31 460 roll 1.07 1.35 - 2531 202.2 2.38 - 3786 529.8 121.6 98.45 0.001 1760 -5.1 10.968 - - - - - - - - -
SM 0.33 - - - - -7.60 - - 615 - - - 2186 - 200.66 48.80 - 1447 -6.4 INF - - - - - -