DavisStrait May07 * SG001 * Dive index * Mission links * Dive 681 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.13 of 91.80 AH used of 24V (62.82% remains)
• Previous NAKs 0, Timeouts 0 • 14.24 of 61.20 AH used of 10V (76.74% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 5.1 m at 5.7 m depth, ceiling 0.6 m
• GPS1 time: 7 s
• GPS2 time: 13 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 668 - - - 2045 - -121.6 -43.55 - 2769 - - - - - - - - - - -
102 0.6 -0.5 6 121 roll -1.07 6.55 - 2060 212.5 2.80 - 570 -526.8 -121.6 - - 2768 - - - - - - - - - - -
230 15.3 7.4 20 343 done -0.25 1.27 - 2282 174.8 - - 2339 - - 99.32 0.001 2266 -5.1 8.004 - - - - - - - - -
349 21.1 - 33 463 roll 1.07 1.23 - 2559 225.2 2.62 - 3786 552.3 121.6 98.75 0.001 1761 -5.1 11.168 - - - - - - - - -
SM 0.33 - - - - -7.48 - - 639 - - - 2048 - 200.41 49.67 - 1445 -6.4 INF - - - - - -