DavisStrait May07 * SG001 * Dive index * Mission links * Dive 680 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 34.08 of 91.80 AH used of 24V (62.87% remains)
• Previous NAKs 2, Timeouts 0 • 14.22 of 61.20 AH used of 10V (76.76% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 2.0 m at 4.8 m depth, ceiling 2.8 m
• GPS1 time: 20 s • bottom range 6.5 m at 7.4 m, depth 14 m (15 m grid)
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 105 done -1.07 - - 643 - - - 2014 - -121.6 -43.80 - 2761 - - - - - - - - - - -
112 1.5 -1.6 7 124 -1.07 6.78 - 2075 211.2 2.20 - 854 -527.3 -121.6 - - 2758 - - - - - - - - - - -
145 7.4 8.6 8 256 done -0.25 1.00 - 2283 208.0 - - 2468 - - 98.32 0.001 2260 -5.1 3.879 - - - - - - - - -
263 16.2 - 21 365 roll 1.07 1.10 - 2560 251.8 2.53 - 3802 527.3 121.6 94.70 0.001 1765 -5.2 8.764 - - - - - - - - -
SM 0.34 - - - - -7.37 - - 647 - - - 2041 - 200.41 48.78 - 1445 -6.6 INF - - - - - -