DavisStrait May07 * SG001 * Dive index * Mission links * Dive 673 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 33.72 of 91.80 AH used of 24V (63.27% remains)
• Previous NAKs 2, Timeouts 0 • 14.11 of 61.20 AH used of 10V (76.95% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 1.3 m at 5.9 m depth, ceiling 4.6 m
• GPS1 time: 32 s
• GPS2 time: 29 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 97 done -1.07 - - 631 - - - 2060 - -121.6 -43.47 - 2767 - - - - - - - - - - -
110 0.4 -0.1 6 122 roll -1.07 6.70 - 2060 213.3 2.53 - 610 -573.1 -121.6 - - 2769 - - - - - - - - - - -
225 15.2 7.1 18 337 done -0.25 0.82 - 2258 241.5 - - 2533 - - 99.15 0.001 2261 -5.1 8.061 - - - - - - - - -
344 21.0 - 31 458 roll 1.07 1.23 - 2540 229.3 2.53 - 3780 492.9 121.6 98.22 0.001 1761 -5.1 11.065 - - - - - - - - -
SM 0.33 - - - - -7.59 - - 621 - - - 2031 - 200.16 49.00 - 1448 -6.4 INF - - - - - -