DavisStrait May07 * SG001 * Dive index * Mission links * Dive 671 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 33.61 of 91.80 AH used of 24V (63.38% remains)
• Previous NAKs 2, Timeouts 0 • 14.07 of 61.20 AH used of 10V (77.00% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 6.2 m at 5.5 m depth, ceiling -0.7 m
• GPS1 time: 23 s
• GPS2 time: 37 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 95 done -1.07 - - 646 - - - 2059 - -121.6 -43.42 - 2765 - - - - - - - - - - -
102 0.3 - 6 121 roll -1.07 6.78 - 2062 208.8 2.42 - 619 -595.0 -121.6 - - 2760 - - - - - - - - - - -
265 15.3 6.6 25 377 done -0.25 0.98 - 2280 222.4 - - 2501 - - 99.68 0.001 2261 -5.0 7.927 - - - - - - - - -
383 21.0 - 38 494 roll 1.07 1.27 - 2546 209.4 2.22 - 3787 579.3 121.6 97.50 0.001 1767 -5.1 11.013 - - - - - - - - -
SM 0.34 - - - - -7.47 - - 625 - - - 2064 - 200.66 49.53 - 1449 -6.4 INF - - - - - -