DavisStrait May07 * SG001 * Dive index * Mission links * Dive 658 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 32.94 of 91.80 AH used of 24V (64.12% remains)
• Previous NAKs 2, Timeouts 0 • 13.85 of 61.20 AH used of 10V (77.36% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 1.4 m at 5.8 m depth, ceiling 4.4 m
• GPS1 time: 23 s
• GPS2 time: 8 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
54 - - - 101 done -1.07 - - 619 - - - 2170 - -121.6 -43.12 - 2746 - - - - - - - - - - -
113 0.9 -1.0 6 127 roll -1.07 7.00 - 2114 213.6 2.60 - 585 -609.6 -121.6 - - 2760 - - - - - - - - - - -
238 15.3 5.8 19 350 done -0.25 1.05 - 2225 105.7 - - 2446 - - 97.43 0.001 2272 -5.0 7.932 - - - - - - - - -
356 20.3 - 32 470 roll 1.07 1.48 - 2553 221.6 2.42 - 3801 559.9 121.6 99.62 0.001 1758 -5.2 10.841 - - - - - - - - -
SM 0.34 - - - - -7.47 - - 628 - - - 2170 - 200.16 49.10 - 1451 -6.3 INF - - - - - -