DavisStrait May07 * SG001 * Dive index * Mission links * Dive 656 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 32.84 of 91.80 AH used of 24V (64.23% remains)
• Previous NAKs 2, Timeouts 0 • 13.82 of 61.20 AH used of 10V (77.42% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 4.8 m at 4.5 m depth, ceiling -0.3 m
• GPS1 time: 21 s
• GPS2 time: 10 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 95 done -1.07 - - 626 - - - 2035 - -121.6 -43.42 - 2749 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 6.78 - 2086 215.3 3.03 - 562 -486.1 -121.6 - - 2756 - - - - - - - - - - -
256 15.1 6.4 24 368 done -0.25 0.98 - 2282 200.0 - - 2450 - - 96.90 0.001 2263 -5.1 7.952 - - - - - - - - -
374 20.3 - 37 488 roll 1.07 1.33 - 2547 199.2 2.62 - 3801 515.6 121.6 98.88 0.001 1767 -5.0 10.539 - - - - - - - - -
SM 0.34 - - - - -7.59 - - 611 - - - 2056 - 200.66 49.45 - 1450 -6.4 INF - - - - - -