DavisStrait May07 * SG001 * Dive index * Mission links * Dive 650 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 32.53 of 91.80 AH used of 24V (64.56% remains)
• Previous NAKs 2, Timeouts 0 • 13.72 of 61.20 AH used of 10V (77.58% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 0.6 m at 5.7 m depth, ceiling 5.1 m
• GPS1 time: 21 s
• GPS2 time: 20 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 593 - - - 2045 - -121.6 -43.83 - 2755 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.03 - 2083 211.9 2.78 - 574 -529.1 -121.6 - - 2759 - - - - - - - - - - -
269 15.2 6.3 25 381 done -0.25 0.75 - 2251 224.0 - - 2450 - - 99.15 0.001 2264 -5.0 7.854 - - - - - - - - -
387 20.8 - 38 501 roll 1.07 1.38 - 2563 226.1 2.50 - 3785 534.0 121.6 98.72 0.001 1764 -5.1 10.904 - - - - - - - - -
SM 0.34 - - - - -7.61 - - 588 - - - 2212 - 200.16 49.35 0.001 1450 -6.4 0.221 - - - - - -