DavisStrait May07 * SG001 * Dive index * Mission links * Dive 642 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 32.12 of 91.80 AH used of 24V (65.01% remains)
• Previous NAKs 2, Timeouts 0 • 13.59 of 61.20 AH used of 10V (77.80% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 0.2 m at 5.3 m depth, ceiling 5.1 m
• GPS1 time: 11 s
• GPS2 time: 13 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 621 - - - 2080 - -121.6 -43.72 - 2757 - - - - - - - - - - -
102 0.3 - 6 126 roll -1.07 7.03 - 2093 209.4 2.38 - 629 -609.7 -121.6 - - 2761 - - - - - - - - - - -
250 15.2 6.2 22 363 done -0.25 1.00 - 2241 148.0 - - 2509 - - 99.00 0.001 2264 -5.0 7.898 - - - - - - - - -
369 20.8 - 35 483 roll 1.07 1.38 - 2568 237.0 2.90 - 3794 443.1 121.6 98.35 0.001 1760 -5.1 11.032 - - - - - - - - -
SM 0.34 - - - - -7.65 - - 614 - - - 2038 - 200.16 49.12 0.001 1445 -6.4 0.223 - - - - - -