DavisStrait May07 * SG001 * Dive index * Mission links * Dive 640 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 32.03 of 91.80 AH used of 24V (65.11% remains)
• Previous NAKs 0, Timeouts 0 • 13.56 of 61.20 AH used of 10V (77.85% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 7.0 m at 5.0 m depth, ceiling -2.0 m
• GPS1 time: 29 s
• GPS2 time: 12 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 96 done -1.07 - - 634 - - - 2023 - -121.6 -43.47 - 2750 - - - - - - - - - - -
103 0.3 - 6 127 roll -1.07 6.78 - 2073 212.2 2.78 - 837 -426.6 -121.6 - - 2759 - - - - - - - - - - -
227 15.0 7.3 19 341 done -0.25 2.03 - 2273 98.5 - - 2600 - - 98.72 0.001 2255 -5.1 7.926 - - - - - - - - -
348 20.4 - 32 462 roll 1.07 1.12 - 2541 239.3 2.53 - 3783 467.6 121.6 99.20 0.001 1762 -5.0 10.493 - - - - - - - - -
SM 0.34 - - - - -7.46 - - 645 - - - 2186 - 200.41 48.62 0.001 1447 -6.5 0.225 - - - - - -