DavisStrait May07 * SG001 * Dive index * Mission links * Dive 637 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.89 of 91.80 AH used of 24V (65.26% remains)
• Previous NAKs 2, Timeouts 0 • 13.51 of 61.20 AH used of 10V (77.92% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 999.0 m at 5.5 m depth, ceiling -993.5 m
• GPS1 time: 20 s
• GPS2 time: 27 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 98 done -1.07 - - 643 - - - 2184 - -121.6 -43.35 - 2761 - - - - - - - - - - -
110 0.5 -0.2 6 133 roll -1.07 6.70 - 2095 216.7 3.03 - 603 -521.8 -121.6 - - 2770 - - - - - - - - - - -
216 15.2 6.4 17 329 done -0.25 0.70 - 2251 222.9 - - 2505 - - 99.57 0.001 2260 -5.1 8.058 - - - - - - - - -
335 20.4 - 30 449 roll 1.07 1.35 - 2561 229.6 3.05 - 3785 419.7 121.6 99.30 0.001 1767 -5.0 10.483 - - - - - - - - -
SM 0.34 - - - - -7.41 - - 649 - - - 2050 - 200.66 48.90 - 1444 -6.6 INF - - - - - -