DavisStrait May07 * SG001 * Dive index * Mission links * Dive 635 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.79 of 91.80 AH used of 24V (65.37% remains)
• Previous NAKs 2, Timeouts 0 • 13.48 of 61.20 AH used of 10V (77.98% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 5.0 m at 5.7 m depth, ceiling 0.7 m
• GPS1 time: 32 s
• GPS2 time: 35 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 620 - - - 1997 - -121.6 -43.67 - 2760 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 6.97 - 2080 209.5 2.40 - 637 -566.7 -121.6 - - 2756 - - - - - - - - - - -
235 15.4 7.0 20 338 done -0.25 0.95 - 2279 209.5 - - 2571 - - 98.55 0.001 2261 -5.0 8.006 - - - - - - - - -
350 21.2 - 32 466 roll 1.07 1.25 - 2539 208.0 1.88 - 3744 623.9 121.6 97.82 0.001 1772 -5.0 10.969 - - - - - - - - -
SM 0.34 - - - - -7.42 - - 652 - - - 1968 - 200.66 49.78 - 1448 -6.5 INF - - - - - -