DavisStrait May07 * SG001 * Dive index * Mission links * Dive 623 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.19 of 91.80 AH used of 24V (66.02% remains)
• Previous NAKs 2, Timeouts 0 • 13.28 of 61.20 AH used of 10V (78.30% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 2.7 m at 5.0 m depth, ceiling 2.3 m
• GPS1 time: 10 s
• GPS2 time: 9 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 638 - - - 1998 - -121.6 -43.20 - 2756 - - - - - - - - - - -
108 0.4 -0.1 6 130 roll -1.07 6.97 - 2088 208.0 2.65 - 851 -432.8 -121.6 - - 2750 - - - - - - - - - - -
222 15.3 6.7 18 330 done -0.25 0.68 - 2228 205.9 - - 2582 - - 98.57 0.001 2258 -5.0 7.904 - - - - - - - - -
337 20.9 - 30 454 roll 1.07 2.03 - 2561 164.0 2.28 - 3729 503.1 121.6 97.95 0.001 1771 -5.0 10.755 - - - - - - - - -
SM 0.34 - - - - -7.62 - - 611 - - - 2115 - 200.90 49.05 - 1446 -6.6 INF - - - - - -