DavisStrait May07 * SG001 * Dive index * Mission links * Dive 622 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.14 of 91.80 AH used of 24V (66.08% remains)
• Previous NAKs 2, Timeouts 0 • 13.27 of 61.20 AH used of 10V (78.32% remains)
• Surface angle 0.0 deg, depth 0.33 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 3.2 m at 5.5 m depth, ceiling 2.3 m
• GPS1 time: 25 s
• GPS2 time: 25 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 604 - - - 2006 - -121.6 -43.47 - 2757 - - - - - - - - - - -
108 0.6 -0.5 6 120 roll -1.07 7.00 - 2091 212.4 2.58 - 839 -452.3 -121.6 - - 2760 - - - - - - - - - - -
243 15.1 6.1 21 355 done -0.25 1.27 - 2249 124.4 - - 2468 - - 98.65 0.001 2260 -5.1 7.921 - - - - - - - - -
362 20.4 - 34 476 roll 1.07 1.52 - 2562 205.9 2.45 - 3789 539.2 121.6 97.43 0.001 1774 -5.0 10.532 - - - - - - - - -
SM 0.33 - - - - -7.38 - - 649 - - - 1991 - 200.16 49.40 - 1440 -6.8 INF - - - - - -