DavisStrait May07 * SG001 * Dive index * Mission links * Dive 621 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.09 of 91.80 AH used of 24V (66.13% remains)
• Previous NAKs 2, Timeouts 0 • 13.25 of 61.20 AH used of 10V (78.35% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 1.4 m at 5.5 m depth, ceiling 4.1 m
• GPS1 time: 23 s
• GPS2 time: 29 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 634 - - - 2149 - -121.6 -43.53 - 2768 - - - - - - - - - - -
102 0.6 -0.4 6 122 roll -1.07 6.75 - 2084 214.8 2.17 - 831 -607.4 -121.6 - - 2766 - - - - - - - - - - -
246 15.3 6.9 22 359 done -0.25 1.02 - 2302 213.7 - - 2581 - - 99.55 0.001 2264 -5.0 7.986 - - - - - - - - -
366 21.1 - 35 477 roll 1.07 1.20 - 2543 200.8 2.22 - 3797 547.7 121.6 98.80 0.001 1760 -5.1 11.141 - - - - - - - - -
SM 0.33 - - - - -7.70 - - 577 - - - 2036 - 200.90 49.70 - 1448 -6.3 INF - - - - - -