DavisStrait May07 * SG001 * Dive index * Mission links * Dive 620 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 31.04 of 91.80 AH used of 24V (66.19% remains)
• Previous NAKs 2, Timeouts 0 • 13.23 of 61.20 AH used of 10V (78.38% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 6.6 m at 4.4 m depth, ceiling -2.2 m
• GPS1 time: 32 s
• GPS2 time: 18 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
50 - - - 95 done -1.07 - - 649 - - - 2083 - -121.6 -43.67 - 2755 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 7.15 - 2109 204.2 2.33 - 640 -619.3 -121.6 - - 2757 - - - - - - - - - - -
267 15.1 5.7 25 379 done -0.25 0.77 - 2253 187.0 - - 2525 - - 99.43 0.001 2261 -5.0 7.796 - - - - - - - - -
386 20.5 - 38 499 roll 1.07 1.15 - 2519 231.3 1.95 - 3726 615.9 121.6 97.45 0.001 1767 -5.1 10.756 - - - - - - - - -
SM 0.33 - - - - -7.47 - - 637 - - - 2145 - 200.66 49.12 - 1451 -6.4 INF - - - - - -