DavisStrait May07 * SG001 * Dive index * Mission links * Dive 617 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 30.88 of 91.80 AH used of 24V (66.36% remains)
• Previous NAKs 2, Timeouts 0 • 13.18 of 61.20 AH used of 10V (78.46% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.1 m at 5.5 m depth, ceiling 3.4 m
• GPS1 time: 32 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 604 - - - 2054 - -121.6 -43.30 - 2763 - - - - - - - - - - -
102 0.6 -0.5 6 123 roll -1.07 7.00 - 2090 212.3 2.60 - 602 -558.5 -121.6 - - 2761 - - - - - - - - - - -
238 15.1 6.6 21 351 done -0.25 0.60 - 2235 241.7 - - 2502 - - 99.10 0.001 2264 -5.0 7.838 - - - - - - - - -
358 20.7 - 34 471 roll 1.07 1.50 - 2580 230.0 2.62 - 3780 487.8 121.6 98.05 0.001 1761 -5.1 10.991 - - - - - - - - -
SM 0.34 - - - - -7.54 - - 627 - - - 2026 - 200.16 48.42 - 1453 -6.4 INF - - - - - -