DavisStrait May07 * SG001 * Dive index * Mission links * Dive 614 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 30.72 of 91.80 AH used of 24V (66.53% remains)
• Previous NAKs 2, Timeouts 0 • 13.13 of 61.20 AH used of 10V (78.54% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 2.5 m at 5.4 m depth, ceiling 2.9 m
• GPS1 time: 26 s
• GPS2 time: 13 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 602 - - - 2054 - -121.6 -43.55 - 2761 - - - - - - - - - - -
101 0.5 -0.4 6 121 roll -1.07 7.00 - 2103 214.4 2.40 - 580 -614.2 -121.6 - - 2755 - - - - - - - - - - -
252 15.1 6.0 23 370 done -0.25 0.70 - 2265 231.4 - - 2472 - - 99.57 0.001 2260 -5.0 7.770 - - - - - - - - -
378 20.7 - 37 491 roll 1.07 1.27 - 2521 201.6 2.33 - 3791 566.1 121.6 98.35 0.001 1765 -5.0 10.783 - - - - - - - - -
SM 0.34 - - - - -7.40 - - 652 - - - 2051 - 200.16 48.33 - 1457 -6.4 INF - - - - - -