DavisStrait May07 * SG001 * Dive index * Mission links * Dive 599 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 29.96 of 91.80 AH used of 24V (67.37% remains)
• Previous NAKs 2, Timeouts 0 • 12.89 of 61.20 AH used of 10V (78.94% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.41 (SM_CC=200) • surface range 0.6 m at 5.9 m depth, ceiling 5.3 m
• GPS1 time: 8 s
• GPS2 time: 30 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 638 - - - 2054 - -121.6 -43.62 - 2755 - - - - - - - - - - -
102 0.6 -0.5 6 127 roll -1.07 6.88 - 2068 207.8 2.40 - 715 -557.9 -121.6 - - 2755 - - - - - - - - - - -
236 15.2 7.5 20 345 done -0.25 1.02 - 2281 208.8 - - 2463 - - 98.88 0.001 2257 -5.0 7.923 - - - - - - - - -
352 21.0 - 32 467 roll 1.07 1.25 - 2564 226.4 2.62 - 3782 503.4 121.6 97.47 0.001 1773 -5.0 10.793 - - - - - - - - -
SM 0.34 - - - - -7.57 - - 615 - - - 2030 - 200.41 49.83 - 1441 -6.7 INF - - - - - -