DavisStrait May07 * SG001 * Dive index * Mission links * Dive 584 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 29.23 of 91.80 AH used of 24V (68.16% remains)
• Previous NAKs 2, Timeouts 0 • 12.64 of 61.20 AH used of 10V (79.35% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 201.15 (beyond SM_CC=200) • surface range 999.0 m at 5.0 m depth, ceiling -994.0 m
• GPS1 time: 11 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 630 - - - 2043 - -121.6 -43.17 - 2760 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 6.78 - 2073 212.8 2.33 - 587 -624.9 -121.6 - - 2758 - - - - - - - - - - -
254 15.2 6.8 23 366 done -0.25 0.62 - 2228 250.0 - - 2366 - - 98.57 0.001 2270 -5.0 7.789 - - - - - - - - -
373 20.8 - 36 486 roll 1.07 1.52 - 2557 216.4 3.03 - 3803 474.3 121.6 98.62 0.001 1768 -5.1 10.959 - - - - - - - - -
SM 0.34 - - - - -7.36 - - 656 - - - 2055 - 201.15 49.40 - 1440 -6.6 INF - - - - - -