DavisStrait May07 * SG001 * Dive index * Mission links * Dive 576 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 28.82 of 91.80 AH used of 24V (68.61% remains)
• Previous NAKs 2, Timeouts 0 • 12.51 of 61.20 AH used of 10V (79.57% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 2.6 m at 5.4 m depth, ceiling 2.8 m
• GPS1 time: 31 s
• GPS2 time: 15 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 617 - - - 2027 - -121.6 -43.30 - 2757 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 7.03 - 2105 211.7 2.25 - 702 -588.9 -121.6 - - 2759 - - - - - - - - - - -
271 15.2 5.6 26 382 done -0.25 0.75 - 2258 204.0 - - 2436 - - 98.35 0.001 2264 -5.0 7.918 - - - - - - - - -
389 20.1 - 39 502 roll 1.07 2.55 - 2526 105.1 2.50 - 3793 542.8 121.6 98.85 0.001 1763 -5.1 10.544 - - - - - - - - -
SM 0.34 - - - - -7.40 - - 659 - - - 2056 - 200.66 48.88 - 1441 -6.6 INF - - - - - -