DavisStrait May07 * SG001 * Dive index * Mission links * Dive 573 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 28.66 of 91.80 AH used of 24V (68.78% remains)
• Previous NAKs 2, Timeouts 0 • 12.46 of 61.20 AH used of 10V (79.65% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.6 m depth, ceiling -993.4 m
• GPS1 time: 26 s
• GPS2 time: 34 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 94 done -1.07 - - 640 - - - 2010 - -121.6 -43.60 - 2758 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 7.53 - 2044 186.5 2.12 - 564 -682.1 -121.6 - - 2764 - - - - - - - - - - -
223 15.3 7.8 19 336 done -0.25 1.00 - 2257 213.0 - - 2489 - - 98.85 0.001 2257 -5.1 8.122 - - - - - - - - -
343 20.8 - 32 456 roll 1.07 1.12 - 2542 254.5 2.72 - 3790 478.3 121.6 99.07 0.001 1763 -5.0 10.735 - - - - - - - - -
SM 0.34 - - - - -7.49 - - 648 - - - 2077 - 200.16 48.92 - 1448 -6.4 INF - - - - - -