DavisStrait May07 * SG001 * Dive index * Mission links * Dive 570 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 28.51 of 91.80 AH used of 24V (68.94% remains)
• Previous NAKs 2, Timeouts 0 • 12.41 of 61.20 AH used of 10V (79.73% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 4.2 m at 5.8 m depth, ceiling 1.6 m
• GPS1 time: 22 s
• GPS2 time: 29 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 617 - - - 2034 - -121.6 -43.25 - 2759 - - - - - - - - - - -
101 0.5 -0.3 6 121 roll -1.07 7.03 - 2090 209.5 2.40 - 593 -600.4 -121.6 - - 2759 - - - - - - - - - - -
235 15.1 6.9 21 347 done -0.25 0.85 - 2238 174.1 - - 2358 - - 98.62 0.001 2261 -5.0 7.892 - - - - - - - - -
354 20.7 - 34 468 roll 1.07 1.75 - 2537 170.9 2.42 - 3789 591.3 121.6 99.03 0.001 1761 -5.0 10.817 - - - - - - - - -
SM 0.35 - - - - -7.48 - - 634 - - - 2051 - 200.16 49.38 0.001 1448 -6.3 0.227 - - - - - -