DavisStrait May07 * SG001 * Dive index * Mission links * Dive 564 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 28.22 of 91.80 AH used of 24V (69.26% remains)
• Previous NAKs 2, Timeouts 0 • 12.31 of 61.20 AH used of 10V (79.89% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.66 (SM_CC=200) • surface range 7.1 m at 5.1 m depth, ceiling -2.0 m
• GPS1 time: 32 s
• GPS2 time: 16 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 96 done -1.07 - - 652 - - - 2046 - -121.6 -43.55 - 2766 - - - - - - - - - - -
108 0.9 -0.9 6 128 roll -1.07 6.53 - 2058 215.3 2.45 - 832 -495.5 -121.6 - - 2761 - - - - - - - - - - -
209 15.1 7.7 17 323 done -0.25 1.00 - 2265 207.0 - - 2584 - - 100.95 0.001 2257 -5.0 7.836 - - - - - - - - -
330 20.7 - 30 446 roll 1.07 1.17 - 2526 223.1 2.75 - 3807 444.7 121.6 98.40 0.001 1762 -5.0 10.823 - - - - - - - - -
SM 0.34 - - - - -7.53 - - 628 - - - 2075 - 200.66 49.25 - 1441 -6.5 INF - - - - - -