DavisStrait May07 * SG001 * Dive index * Mission links * Dive 552 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 27.61 of 91.80 AH used of 24V (69.93% remains)
• Previous NAKs 2, Timeouts 0 • 12.11 of 61.20 AH used of 10V (80.21% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.16 (SM_CC=200) • surface range 999.0 m at 5.6 m depth, ceiling -993.4 m
• GPS1 time: 31 s
• GPS2 time: 7 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 629 - - - 2072 - -121.6 -43.70 - 2765 - - - - - - - - - - -
102 0.3 - 6 122 roll -1.07 6.72 - 2073 214.9 2.42 - 620 -600.0 -121.6 - - 2756 - - - - - - - - - - -
254 15.2 6.9 23 363 done -0.25 0.85 - 2283 247.1 - - 2416 - - 99.10 0.001 2257 -5.0 7.922 - - - - - - - - -
370 21.0 - 35 486 roll 1.07 1.20 - 2542 215.8 2.62 - 3789 524.0 121.6 98.10 0.001 1769 -5.0 10.812 - - - - - - - - -
SM 0.34 - - - - -7.58 - - 614 - - - 2046 - 200.16 49.00 - 1444 -6.6 INF - - - - - -