DavisStrait May07 * SG001 * Dive index * Mission links * Dive 520 * Raw log
prev dive * next dive * dive
• Previous call tries 1 • 26.06 of 91.80 AH used of 24V (71.61% remains)
• Previous NAKs 2, Timeouts 0 • 11.60 of 61.20 AH used of 10V (81.05% remains)
• Surface angle 0.0 deg, depth 0.34 m • Intended pitch -17.3 deg, speed -7.143 cm/s
VBD pumped to 200.90 (SM_CC=200) • surface range 999.0 m at 5.8 m depth, ceiling -993.2 m
• GPS1 time: 20 s
• GPS2 time: 31 s • Transponder ping count: -1
• Time spent turning 0 s

Statistics * Plot
t(s) depth(m) w(cm/s) num pts t(s) GC phase pitch roll VBD pit rol VBD volts
ctl(cm) t(s) A pos(AD) rate t(s) A pos(AD) rate ctl(cc) t(s) A pos(AD) rate eff r e r e r e pitrollvbd flags
49 - - - 95 done -1.07 - - 665 - - - 2045 - -121.6 -43.47 - 2764 - - - - - - - - - - -
101 0.3 - 6 125 roll -1.07 6.88 - 2067 203.8 2.62 - 574 -561.5 -121.6 - - 2764 - - - - - - - - - - -
223 15.4 7.8 19 335 done -0.25 0.90 - 2245 197.8 - - 2479 - - 98.85 0.001 2267 -5.0 8.014 - - - - - - - - -
341 20.9 - 32 454 roll 1.07 1.77 - 2520 155.4 2.42 - 3786 540.1 121.6 98.95 0.001 1768 -5.0 10.909 - - - - - - - - -
SM 0.34 - - - - -7.50 - - 630 - - - 2070 - 200.90 49.50 - 1450 -6.4 INF - - - - - -